Installation
Substrate Preparation
Grinding, patching, and moisture barriers are scoped before adhesive selection; we never install over uncured screed.
Wall panels require plumb lines within three millimetres over three metres; crews correct minor deviations with backer shims.
Scheduling Occupied Spaces
Phased installs keep one living zone usable each night in occupied apartments around Porta Nuova.
Odour-low adhesives allow same-day return where ventilation meets manufacturer charts.
Quality Checks
Seam probes and roller passes are logged room by room; heat-welding rods are colour-matched to field material.
Floor flatness is verified with a two-metre straightedge before any plank layout begins.
Handover Documentation
You receive maintenance cards, leftover tile labels, and adhesive batch numbers stored for future repairs.
Warranty registration with manufacturers is completed on your behalf when serial codes are required.
Post-Install Support
Thirty-day callbacks address edge lift from seasonal humidity without treating it as a new project.
Furniture glide upgrades are suggested when heavy sofas sit on newly laid LVT.